Pedestrian/Bike Restrictions, Women's Plaza Andre Nolin 520.268.2319) 10/7/2024 7:00:00 AM 4/30/2025 7:00:00 AM 6:00AM - 3:00PM, Monday - Friday
Walkway By Women's Plaza

Facilities Management will have a contractor making upgrades to the steam system, utilizing the manhole located at the Southwest corner of Centennial Hall (building 29) by the Women's Plaza beginning today, October 7, 2024. 

Pedestrian traffic to the area around the manhole will be barricaded and pedestrian and bike traffic diverted until the work is complete.

Estimated time of completion: April 30, 2025.                                                                                               


Noise and Elevator Traffic Disruptions Richard Montiel 520-437-8861) 10/21/2024 7:00:00 AM 2/1/2025 7:00:00 AM 6:00AM-3:00PM daily
724/724A

Facilities Management Renovations will have a contractor assisting with the demolition of exiting, framing, electrical and plumbing in rooms 724 and 724A  of Marley (building 107) beginning Monday, October 21, 2024 at 6:00AM.

There will be intermittent use of the freight elevator and noise disruptions in the surrounding areas while the demolition and renovations are in progress.

Work will continue Monday - Friday from 6:00AM-3:00PM through February 1, 2025.

Fire Alarm and Fire Sprinkler System upgrade Brad Strizver 520-241-3103) 12/16/2024 7:00:00 AM 3/28/2025 7:00:00 AM 6:00 am - 4:00 pm Daily

UFS-Facilities Management Fire Safety department will oversee the upgrade of the Fire Alarm System and Sprinkler system.  Workers will be in the building working on installation.  All workers will have their company shirt or vest on for identification purposes. There will be some noise associated with hammer drills and core drills. Please contact Brad Strizver, Fire & Electrical Projects Lead, with any questions or need for assistance in planning quiet times as needed for meetings, etc.

Road Closure Colin Redman 608-354-3566) 12/23/2024 7:00:00 AM 1/10/2025 7:00:00 AM 12/23 5am to 1/10 5pm
Park Avenue

An outside contractor has scheduled a 24/7 full road closure of Park Avenue from Monday, 12/23/24, at 5AM to Friday, 1/10/24, at 5PM to repave the asphalt on Park Avenue. Please be aware that Park Avenue will be completely closed between Speedway and 2nd Avenue. A traffic control plan of the closure is attached for reference. Access to the Aspire/Parker parking garages will be maintained from Tyndall/1st Avenue.

Fire Alarm Modification Brad Strizver 520-241-3103) 12/30/2024 7:00:00 AM 4/25/2025 7:00:00 AM 6:00AM - 2:30PM Daily

Facilities Management Fire Safety and Faulk Electric will be making modifications to the fire alarm system in Art (building 2) beginning Friday, December 30, 2024.

There alarm system will remain in service as the new alarm devices are installed. 

Estimated date of completion: April 25, 2025.

Air Handler Shutdown Mechanical Shop 520-626-6879) 1/6/2025 7:00:00 AM 1/6/2025 7:00:00 AM 6:00AM-9:00AM

Facilities Management will be performing preventative maintenance on building air handlers.  Heating and cooling will be affected during the scheduled repair time.

Domestic Water Shutdown Jose Rodriguez 520.345.3511) 1/6/2025 7:00:00 AM 1/6/2025 7:00:00 AM 6:00AM-8:00AM

The Facilities Management Plumbing Shop will be making repairs to the domestic water system in McClelland Park (building 78) on Monday, January 6, 2025 beginning at 6:00AM.

Sinks, toilets or drinking fountains will not have water until repairs are complete.

Estimated completion time: 8:00AM.

Annual Fire Alarm Test Facilities Management Fire Safety 520-626-6657) 1/6/2025 7:00:00 AM 1/6/2025 7:00:00 AM 7:00 am - 3:00 pm

Facilities Management Fire Safety will be testing the fire alarm system.  The fire alarm horns and strobes in the building will be activated between 7:00 A.M. and 8:00 A.M. to verify they are operational.  All subsequent testing in the building will be conducted silently.  

Elevators will be affected intermittently for about 30 minutes during the test; signs will be posted prior to the start and removed when complete.

Emergency Lighting, Exit Lights, Fire Extinguishers Fire Sprinkler and Suppression systems will also be inspected throughout the week by Facilities Management staff and vendors, this testing will be conducted silently.

Air Handler Shutdown Mechanical Shop 520-626-6879) 1/7/2025 7:00:00 AM 1/8/2025 7:00:00 AM 6:00AM-11:00AM

Facilities Management will be performing preventative maintenance on building air handlers.  Heating and cooling will be affected during the scheduled repair time.

Air Handler & Exhaust Fans Shutdown Mechanical Shop 520-626-6879) 1/7/2025 7:00:00 AM 1/7/2025 7:00:00 AM 6:00AM-2:00PM

Facilities Management will be performing preventative maintenance. Air handlers will be shut off one at a time for servicing. Roof exhaust fans will all be off the entire time during the scheduled hours.

*NOTE: All chemical in hoods must be capped or removed prior.

The morning of the shutdown, each fume hood will have a placard placed on the front. Fume hoods cannot be used during the shutdown, and they will be checked to assure all chemicals are capped or removed.

https://rgw.arizona.edu/sites/researchgateway/files/cs-proper_use_of_a_chemical_fume_hood_usop_0.pdf

Annual Fire Alarm Test Facilities Management Fire Safety 520-626-6657) 1/7/2025 7:00:00 AM 1/7/2025 7:00:00 AM 7:00 am - 3:00 pm

Facilities Management Fire Safety will be testing the fire alarm system.  The fire alarm horns and strobes in the building will be activated between 7:00 A.M. and 8:00 A.M. to verify they are operational.  All subsequent testing in the building will be conducted silently.  

Elevators will be affected intermittently for about 30 minutes during the test; signs will be posted prior to the start and removed when complete.

Emergency Lighting, Exit Lights, Fire Extinguishers Fire Sprinkler and Suppression systems will also be inspected throughout the week by Facilities Management staff and vendors, this testing will be conducted silently.

Annual Fire Alarm Test Facilities Management Fire Safety 520-626-6657) 1/8/2025 7:00:00 AM 1/8/2025 7:00:00 AM 7:00 am - 3:00 pm

Facilities Management Fire Safety will be testing the fire alarm system.  The fire alarm horns and strobes in the building will be activated between 7:00 A.M. and 8:00 A.M. to verify they are operational.  All subsequent testing in the building will be conducted silently.  

Elevators will be affected intermittently for about 30 minutes during the test; signs will be posted prior to the start and removed when complete.

Emergency Lighting, Exit Lights, Fire Extinguishers Fire Sprinkler and Suppression systems will also be inspected throughout the week by Facilities Management staff and vendors, this testing will be conducted silently.

Exhaust Fan Shutdown Mechanical Shop 520-626-6879) 1/8/2025 7:00:00 AM 1/8/2025 7:00:00 AM 6:00AM-2:00PM

Exhaust fans to fume hoods, chemical storage cabinets, biosafety cabinets and general exhaust, including restrooms, will be down for preventative maintenance.

Fume hoods are not to be used during this shutdown. All chemical bottles should be capped. This may cause doors to stay ajar.

https://rgw.arizona.edu/sites/researchgateway/files/cs-proper_use_of_a_chemical_fume_hood_usop_0.pdf

Annual Fire Alarm Test Facilities Management Fire Safety 520-626-6657) 1/9/2025 7:00:00 AM 1/9/2025 7:00:00 AM 7:00 am - 3:00 pm

Facilities Management Fire Safety will be testing the fire alarm system.  The fire alarm horns and strobes in the building will be activated between 7:00 A.M. and 8:00 A.M. to verify they are operational.  All subsequent testing in the building will be conducted silently.  

Elevators will be affected intermittently for about 30 minutes during the test; signs will be posted prior to the start and removed when complete.

Emergency Lighting, Exit Lights, Fire Extinguishers Fire Sprinkler and Suppression systems will also be inspected throughout the week by Facilities Management staff and vendors, this testing will be conducted silently.

Air Handler Shutdown Mechanical Shop 520-626-6879) 1/9/2025 7:00:00 AM 1/9/2025 7:00:00 AM 6:00AM-10:00AM

Facilities Management will be performing preventative maintenance on building air handlers.  Heating and cooling will be affected during the scheduled repair time.

Air Handler Shutdown Mechanical Shop 520-626-6879) 1/9/2025 7:00:00 AM 1/9/2025 7:00:00 AM 6:00AM-2:00PM

Facilities Management will be performing preventative maintenance on building air handlers.  Heating and cooling will be affected during the scheduled repair time.

Building Heat Shutdown Ryan Tucker 520-345-1073) 1/9/2025 7:00:00 AM 1/9/2025 7:00:00 AM 7:00am – 12:00pm

A Facilities Management Vendor will be replacing a steam valve in the basement mechanical room. There will be no building heat until repairs are complete.

Annual Fire Alarm Test Facilities Management Fire Safety 520-626-6657) 1/10/2025 7:00:00 AM 1/10/2025 7:00:00 AM 7:00 am - 3:00 pm

Facilities Management Fire Safety will be testing the fire alarm system.  The fire alarm horns and strobes in the building will be activated between 7:00 A.M. and 8:00 A.M. to verify they are operational.  All subsequent testing in the building will be conducted silently.  

Elevators will be affected intermittently for about 30 minutes during the test; signs will be posted prior to the start and removed when complete.

Emergency Lighting, Exit Lights, Fire Extinguishers Fire Sprinkler and Suppression systems will also be inspected throughout the week by Facilities Management staff and vendors, this testing will be conducted silently.

Air Handler Shutdown Mechanical Shop 520-626-6879) 1/10/2025 7:00:00 AM 1/10/2025 7:00:00 AM 6:00AM-10:00AM

Facilities Management will be performing preventative maintenance on building air handlers.  Heating and cooling will be affected during the scheduled repair time.

Annual Fire Alarm Test Facilities Management Fire Safety 520-626-6657) 1/13/2025 7:00:00 AM 1/14/2025 7:00:00 AM 7:00 am - 3:00 pm

Facilities Management Fire Safety will be testing the fire alarm system.  The fire alarm horns and strobes in the building will be activated between 7:00 A.M. and 8:00 A.M. to verify they are operational.  All subsequent testing in the building will be conducted silently.  

Elevators will be affected intermittently for about 30 minutes during the test; signs will be posted prior to the start and removed when complete.

Emergency Lighting, Exit Lights, Fire Extinguishers Fire Sprinkler and Suppression systems will also be inspected throughout the week by Facilities Management staff and vendors, this testing will be conducted silently.

Air Handler Shutdown Mechanical Shop 520-626-6879) 1/14/2025 7:00:00 AM 1/16/2025 7:00:00 AM 6:00AM-10:00AM
Clinical Science

Facilities Management will be performing preventative maintenance on building air handlers.  Heating and cooling will be affected during the scheduled repair time.

Exhaust Fan Shutdown Mechanical Shop 520-626-6879) 1/14/2025 7:00:00 AM 1/14/2025 7:00:00 AM 4:00AM-12:00PM

Exhaust fans to fume hoods, chemical storage cabinets, biosafety cabinets and general exhaust, including restrooms, will be down for preventative maintenance.

Fume hoods are not to be used during this shutdown. All chemical bottles should be capped. This may cause doors to stay ajar.

https://rgw.arizona.edu/sites/researchgateway/files/cs-proper_use_of_a_chemical_fume_hood_usop_0.pdf

Annual Fire Alarm Test Facilities Management Fire Safety 520-626-6657) 1/15/2025 7:00:00 AM 1/16/2025 7:00:00 AM 7:00 am - 3:00 pm

Facilities Management Fire Safety will be testing the fire alarm system.  The fire alarm horns and strobes in the building will be activated between 7:00 A.M. and 8:00 A.M. to verify they are operational.  All subsequent testing in the building will be conducted silently.  

Elevators will be affected intermittently for about 30 minutes during the test; signs will be posted prior to the start and removed when complete.

Emergency Lighting, Exit Lights, Fire Extinguishers Fire Sprinkler and Suppression systems will also be inspected throughout the week by Facilities Management staff and vendors, this testing will be conducted silently.

Air Handler & Exhaust Fans Shutdown Mechanical Shop 520-626-6879) 1/15/2025 7:00:00 AM 1/15/2025 7:00:00 AM 6:00AM-2:00PM

Facilities Management will be performing preventative maintenance. Air handlers will be shut off one at a time for servicing. Roof exhaust fans will all be off the entire time during the scheduled hours.

*NOTE: All chemical in hoods must be capped or removed prior.

The morning of the shutdown, each fume hood will have a placard placed on the front. Fume hoods cannot be used during the shutdown, and they will be checked to assure all chemicals are capped or removed.

https://rgw.arizona.edu/sites/researchgateway/files/cs-proper_use_of_a_chemical_fume_hood_usop_0.pdf

Exhaust Fan Shutdown Mechanical Shop 520-626-6879) 1/16/2025 7:00:00 AM 1/16/2025 7:00:00 AM 6:00AM-2:00PM

Exhaust fans to fume hoods, chemical storage cabinets, biosafety cabinets and general exhaust, including restrooms, will be down for preventative maintenance.

Fume hoods are not to be used during this shutdown. All chemical bottles should be capped. This may cause doors to stay ajar.

https://rgw.arizona.edu/sites/researchgateway/files/cs-proper_use_of_a_chemical_fume_hood_usop_0.pdf

Annual Fire Alarm Test Facilities Management Fire Safety 520-626-6657) 1/17/2025 7:00:00 AM 1/17/2025 7:00:00 AM 7:00 am - 3:00 pm

Facilities Management Fire Safety will be testing the fire alarm system.  The fire alarm horns and strobes in the building will be activated between 7:00 A.M. and 8:00 A.M. to verify they are operational.  All subsequent testing in the building will be conducted silently.  

Elevators will be affected intermittently for about 30 minutes during the test; signs will be posted prior to the start and removed when complete.

Emergency Lighting, Exit Lights, Fire Extinguishers Fire Sprinkler and Suppression systems will also be inspected throughout the week by Facilities Management staff and vendors, this testing will be conducted silently.

Air Handler Shutdown Mechanical Shop 520-626-6879) 1/17/2025 7:00:00 AM 1/17/2025 7:00:00 AM 6:00AM-10:00AM

Facilities Management will be performing preventative maintenance on building air handlers.  Heating and cooling will be affected during the scheduled repair time.

Annual Fire Alarm Test Facilities Management Fire Safety 520-626-6657) 1/21/2025 7:00:00 AM 1/23/2025 7:00:00 AM 7:00 am - 3:00 pm

Facilities Management Fire Safety will be testing the fire alarm system.  The fire alarm horns and strobes in the building will be activated between 7:00 A.M. and 8:00 A.M. to verify they are operational.  All subsequent testing in the building will be conducted silently.  

Elevators will be affected intermittently for about 30 minutes during the test; signs will be posted prior to the start and removed when complete.

Emergency Lighting, Exit Lights, Fire Extinguishers Fire Sprinkler and Suppression systems will also be inspected throughout the week by Facilities Management staff and vendors, this testing will be conducted silently.

Exhaust Fan Shutdown Mechanical Shop 520-626-6879) 1/21/2025 7:00:00 AM 1/21/2025 7:00:00 AM 6:00AM-2:00PM

Exhaust fans to fume hoods, chemical storage cabinets, biosafety cabinets and general exhaust, including restrooms, will be down for preventative maintenance.

Fume hoods are not to be used during this shutdown. All chemical bottles should be capped. This may cause doors to stay ajar.

https://rgw.arizona.edu/sites/researchgateway/files/cs-proper_use_of_a_chemical_fume_hood_usop_0.pdf

Air Handler Shutdown Mechanical Shop 520-626-6879) 1/22/2025 7:00:00 AM 1/23/2025 7:00:00 AM 6:00AM-10:00AM

Facilities Management will be performing preventative maintenance on building air handlers.  Heating and cooling will be affected during the scheduled repair time.

Exhaust Fan Shutdown Mechanical Shop 520-626-6879) 1/22/2025 7:00:00 AM 1/22/2025 7:00:00 AM 6:00AM-2:00PM

Exhaust fans to fume hoods, chemical storage cabinets, biosafety cabinets and general exhaust, including restrooms, will be down for preventative maintenance.

Fume hoods are not to be used during this shutdown. All chemical bottles should be capped. This may cause doors to stay ajar.

https://rgw.arizona.edu/sites/researchgateway/files/cs-proper_use_of_a_chemical_fume_hood_usop_0.pdf

Air Handler & Exhaust Fans Shutdown Mechanical Shop 520-626-6879) 1/23/2025 7:00:00 AM 1/23/2025 7:00:00 AM 6:00AM-2:00PM

Facilities Management will be performing preventative maintenance. Air handlers will be shut off one at a time for servicing. Roof exhaust fans will all be off the entire time during the scheduled hours.

*NOTE: All chemical in hoods must be capped or removed prior.

The morning of the shutdown, each fume hood will have a placard placed on the front. Fume hoods cannot be used during the shutdown, and they will be checked to assure all chemicals are capped or removed.

https://rgw.arizona.edu/sites/researchgateway/files/cs-proper_use_of_a_chemical_fume_hood_usop_0.pdf

Air Handler & Exhaust Fans Shutdown Mechanical Shop 520-626-6879) 1/24/2025 7:00:00 AM 1/24/2025 7:00:00 AM 6:00AM - 2:00PM

Facilities Management will be performing preventative maintenance. Air handlers will be shut off one at a time for servicing. Roof exhaust fans will all be off the entire time during the scheduled hours.

*NOTE: All chemical in hoods must be capped or removed prior.

The morning of the shutdown, each fume hood will have a placard placed on the front. Fume hoods cannot be used during the shutdown, and they will be checked to assure all chemicals are capped or removed.

https://rgw.arizona.edu/sites/researchgateway/files/cs-proper_use_of_a_chemical_fume_hood_usop_0.pdf

Annual Fire Alarm Test Facilities Management Fire Safety 520-626-6657) 1/24/2025 7:00:00 AM 1/24/2025 7:00:00 AM 7:00 am - 3:00 pm

Facilities Management Fire Safety will be testing the fire alarm system.  The fire alarm horns and strobes in the building will be activated between 7:00 A.M. and 8:00 A.M. to verify they are operational.  All subsequent testing in the building will be conducted silently.  

Elevators will be affected intermittently for about 30 minutes during the test; signs will be posted prior to the start and removed when complete.

Emergency Lighting, Exit Lights, Fire Extinguishers Fire Sprinkler and Suppression systems will also be inspected throughout the week by Facilities Management staff and vendors, this testing will be conducted silently.

Annual Fire Alarm Test Facilities Management Fire Safety 520-626-6657) 1/27/2025 7:00:00 AM 1/28/2025 7:00:00 AM 7:00 am - 3:00 pm

Facilities Management Fire Safety will be testing the fire alarm system.  The fire alarm horns and strobes in the building will be activated between 7:00 A.M. and 8:00 A.M. to verify they are operational.  All subsequent testing in the building will be conducted silently.  

Elevators will be affected intermittently for about 30 minutes during the test; signs will be posted prior to the start and removed when complete.

Emergency Lighting, Exit Lights, Fire Extinguishers Fire Sprinkler and Suppression systems will also be inspected throughout the week by Facilities Management staff and vendors, this testing will be conducted silently.

Air Handler Shutdown Mechanical Shop 520-626-6879) 1/28/2025 7:00:00 AM 1/29/2025 7:00:00 AM 6:00AM-10:00AM

Facilities Management will be performing preventative maintenance on building air handlers.  Heating and cooling will be affected during the scheduled repair time.

Air Handler & Exhaust Fans Shutdown Mechanical Shop 520-626-6879) 1/28/2025 7:00:00 AM 1/28/2025 7:00:00 AM 6:00AM-2:00PM

Facilities Management will be performing preventative maintenance. Air handlers will be shut off one at a time for servicing. Roof exhaust fans will all be off the entire time during the scheduled hours.

*NOTE: All chemical in hoods must be capped or removed prior.

The morning of the shutdown, each fume hood will have a placard placed on the front. Fume hoods cannot be used during the shutdown, and they will be checked to assure all chemicals are capped or removed.

https://rgw.arizona.edu/sites/researchgateway/files/cs-proper_use_of_a_chemical_fume_hood_usop_0.pdf

Annual Fire Alarm Test Facilities Management Fire Safety 520-626-6657) 1/29/2025 7:00:00 AM 1/30/2025 7:00:00 AM 7:00 am - 3:00 pm

Facilities Management Fire Safety will be testing the fire alarm system.  The fire alarm horns and strobes in the building will be activated between 7:00 A.M. and 8:00 A.M. to verify they are operational.  All subsequent testing in the building will be conducted silently.  

Elevators will be affected intermittently for about 30 minutes during the test; signs will be posted prior to the start and removed when complete.

Emergency Lighting, Exit Lights, Fire Extinguishers Fire Sprinkler and Suppression systems will also be inspected throughout the week by Facilities Management staff and vendors, this testing will be conducted silently.

Air Handler Shutdown Mechanical Shop 520-626-6879) 1/29/2025 7:00:00 AM 1/29/2025 7:00:00 AM 6:00AM-12:00PM

Facilities Management will be performing preventative maintenance on building air handlers.  Heating and cooling will be affected during the scheduled repair time.

Exhaust Fan Shutdown Mechanical Shop 520-626-6879) 1/30/2025 7:00:00 AM 1/30/2025 7:00:00 AM 6:00AM-2:00PM

Exhaust fans to fume hoods, chemical storage cabinets, biosafety cabinets and general exhaust, including restrooms, will be down for preventative maintenance.

Fume hoods are not to be used during this shutdown. All chemical bottles should be capped. This may cause doors to stay ajar.

https://rgw.arizona.edu/sites/researchgateway/files/cs-proper_use_of_a_chemical_fume_hood_usop_0.pdf

Air Handler & Exhaust Fans Shutdown Mechanical Shop 520-626-6879) 1/30/2025 7:00:00 AM 1/30/2025 7:00:00 AM 4:00AM-12:00PM

Facilities Management will be performing preventative maintenance. Air handlers will be shut off one at a time for servicing. Roof exhaust fans will all be off the entire time during the scheduled hours.

*NOTE: All chemical in hoods must be capped or removed prior.

The morning of the shutdown, each fume hood will have a placard placed on the front. Fume hoods cannot be used during the shutdown, and they will be checked to assure all chemicals are capped or removed.

https://rgw.arizona.edu/sites/researchgateway/files/cs-proper_use_of_a_chemical_fume_hood_usop_0.pdf

Annual Fire Alarm Test Facilities Management Fire Safety 520-626-6657) 1/31/2025 7:00:00 AM 1/31/2025 7:00:00 AM 7:00 am - 3:00 pm

Facilities Management Fire Safety will be testing the fire alarm system.  The fire alarm horns and strobes in the building will be activated between 7:00 A.M. and 8:00 A.M. to verify they are operational.  All subsequent testing in the building will be conducted silently.  

Elevators will be affected intermittently for about 30 minutes during the test; signs will be posted prior to the start and removed when complete.

Emergency Lighting, Exit Lights, Fire Extinguishers Fire Sprinkler and Suppression systems will also be inspected throughout the week by Facilities Management staff and vendors, this testing will be conducted silently.

An error has occurred. This application may no longer respond until reloaded. Reload 🗙